alexander h. whang

Pages

▼

Pages

▼
Sunday, April 12, 2020

SBS - Six Leg Robot - Installment 6

›
Six Leg Robot / Walker Step – by – step (Installment 6) A Bit More Weathering      I treated all the legs and feet with the sea sponge...
Saturday, April 11, 2020

SBS - Six Leg Robot - Installment 5

›
Six Leg Robot / Walker Step – by – step (Installment 5) Weathering – Oil Dot Filters              The next step is to start adding som...
Friday, April 10, 2020

SBS - Six Leg Robot - Installment 4

›
Six Leg Robot / Walker Step – by – step (Installment 4) After the Base Coat After the base coat step I started to drill new holes fo...
Sunday, April 5, 2020

SBS - Six Leg Robot - Installment 3

›
Six Leg Robot / Walker Step – by – step (Installment 3) More Details           Another detail I added was something to help set the ...
Saturday, April 4, 2020

SBS - Six Leg Robot - Installment 2

›
Six Leg Robot / Walker Step – by – step (Installment 2) The Build I used two part epoxy resin glue to secure the pins and legs.   To...
›
Home
View web version

About Me

alexander whang
Monterey Park, CA., United States
View my complete profile
Powered by Blogger.